Problem 16-10
The times required to complete each of eight jobs in a two-machine flow shop are shown in the table that follows. Each job must follow the same sequence, beginning with machine A and moving to machine B. |
TIME (hours) |
||
Job | Machine A | Machine B |
a | 16 | 5 |
b | 3 | 13 |
c | 9 | 6 |
d | 8 | 7 |
e | 2 | 14 |
f | 12 | 4 |
g | 18 | 14 |
h | 20 | 11 |
|
a. | Determine a sequence that will minimize makespan time. |
The sequence is . |
b. | Find machine B’s idle time. |
Idle time | . |
b. | Determine idle time of center 2, assuming no other activities are involved. |
Idle time